Bathroom Remodeling Before and After Photos

Master bathroom remodel

Project details: Remove jacuzzi tub, shower, bath floor tile and countertops. Build linen closet and paint bathroom.

Hardiplank siding installation and paint on two story home.

Build concrete shower floor

Pier and beam foundations will rot over time from dampness. The rotten floor joists were removed and replaced.

Window and shampoo niche install

A vapor retarder was added to the joists to block moisture from getting to the hardwood floors. Followed by the plywood subfloor installation.

Shower and bath floor tile install

After the flooring prep work, we installed the engineered hardwood floors.

Quartz countertop and painting

Now baseboards put in place and the project is complete.

"We are very pleased with the floors and sincerely appreciate their attention to detail. Their services are highly recommended!"
1_7
Anna Richmond
Heights homeowner

More projects