Master bathroom remodel
Project details: Remove jacuzzi tub, shower, bath floor tile and countertops. Build linen closet and paint bathroom.
Build concrete shower floor
Pier and beam foundations will rot over time from dampness. The rotten floor joists were removed and replaced.
Window and shampoo niche install
A vapor retarder was added to the joists to block moisture from getting to the hardwood floors. Followed by the plywood subfloor installation.
Shower and bath floor tile install
After the flooring prep work, we installed the engineered hardwood floors.
Quartz countertop and painting
Now baseboards put in place and the project is complete.
"We are very pleased with the floors and sincerely appreciate their attention to detail. Their services are highly recommended!"
Anna Richmond
Heights homeowner